Skip to navigation Skip to content

Strategy & Reports

2006 Monitoring Our Environment Report

>2006 Monitoring Our Environment Report
Discharges and monitoring of the environment in the UK. Annual Report 2006.
Download 2006 Monitoring Our Environment Report

Beach Monitoring - Map of finds to June 2008.

>Beach Monitoring - Map of finds to June 2008.
Map showing location of all finds upto June 2008.
Download Beach Monitoring - Map of finds to June 2008.

Beach Monitoring - September 2008

>Beach Monitoring - September 2008
See latest results from environmental monitoring of beaches near Sellafield. These have been analysed by the Health Protection Agency who have given the following advice: "On the basis of information provided by the Environment Agency on 6 July 2007 on the finding of radioactive particles on beaches near the Sellafield site, the Health Protection Agency (HPA) considers that no special precautionary actions are necessary at this time regarding access to or use of these beaches. However, HPA will continue to work with relevant authorities to keep the situation under investigation."
Download Beach Monitoring - September 2008

Clean-up Workshop Output Document

>Clean-up Workshop Output Document
British Nuclear Group Integrated Strategy for Sellafield Stakeholder Workshops
Download Clean-up Workshop Output Document

Corporate Responsibility Report 2007

>Corporate Responsibility Report 2007
BNFL has published its latest Corporate Responsibility Report, click below to view the Sellafield section.

To view the full report, please visit the BNFL website.
Download Corporate Responsibility Report 2007

Developing Capenhurst

>Developing Capenhurst
Developing Capehurst
Download Developing Capenhurst

Production Operations Framework Document

>Production Operations Framework Document

Magnox fuel reprocessing, Oxide fuel reprocessing, Mixed oxide fuel manufacture


Download Production Operations Framework Document

Production Operations Workshop Output Document

>Production Operations Workshop Output Document
British Nuclear Group Integrated Strategy for Sellafield Stakeholder Workshops
Download Production Operations Workshop Output Document

Quarterly Business Update

>Quarterly Business Update

Sellafield Integrated Waste Strategy

>Sellafield Integrated Waste Strategy
Read about the current and previous version of the Sellafield Integrated Waste Strategy.
Download Sellafield Integrated Waste Strategy

Sellafield Integrated Waste Strategy - Baseline document

>Sellafield Integrated Waste Strategy - Baseline document

Sellafield Integrated Waste Strategy - Framework document

>Sellafield Integrated Waste Strategy - Framework document

Sellafield Integrated Waste Strategy - Recommendation

>Sellafield Integrated Waste Strategy - Recommendation

Sellafield Integrated Waste Strategy - update to version 2

>Sellafield Integrated Waste Strategy - update to version 2

Site clean-up Framework Document

>Site clean-up Framework Document

The clean-up strategy is composed of the following elements:

  • Post operational clean-out
  • Decommissioning 
  • Legacy ponds and legacy silos
  • Infrastructure

Download Site clean-up Framework Document

Thorp BOI

>Thorp BOI
Thorp Feed Clarification Board of Inquiry
Download Thorp BOI

Waste Management Framework Document

>Waste Management Framework Document
  • high-level wastes 
  • intermediate-level wastes 
  • low-level wastes 
  • exempt materials 
  • aerial and liquid discharges 
  • waste storage

Download Waste Management Framework Document

Waste Management Workshop Output Document

>Waste Management Workshop Output Document
British Nuclear Group Integrated Strategy for Sellafield Stakeholder Workshops
Download Waste Management Workshop Output Document

Sellafield Ltd News

Image:

Access the latest news about our activities across Sellafield Ltd


Feedback




Thank you for your feedback.