Low Level Wastes on the Sellafield site

Over the past few months, Sellafield Ltd have held a series of workshops, looking at the best options of dealing with waste oils, metals, combustible materials, asbestos and high volumes of low level radioactive waste.

All the consultation documents, reports and the final BPEO reports are below.

PCM Brochure  
Low Level Waste Brochure  

Radioactive waste oils workshop - 2 November 2007:

Introductory presentation, Technical presentation, Questionnaire responses, Final report of external workshop, Final report of internal workshop

Radioactive waste metals workshop - 21 November 2007:

Introductory presentation, Technical presentation, Questionnaire responses,  Final report of external workshop, Final report of internal workshop

Process waste workshop - 10 December 2007:

Introductory presentation, Technical presentation, Questionnaire responses, Final report of external workshop, Final report internal workshop

Asbestos workshop - 22 January 2008 :

Introductory presentation, Technical presentation. Questionnaire responses, Final external workshop, Final internal workshop

HVLA workshop - 12 February 2008:

Introductory presentation, presentation waste definition, presentation risk assessment, technical presentation , presentation contaminated landQuestionnaire responses, final external report, final internal report

Final workshop reports

In March a final workshop was held to consider any themes, synergies or opportunities that may have arisen from the previous workshops. A summary report can be found below

Final workshop report

BPEO summary reports

Radioactive waste metalsRadioactive waste oils, Process waste

We have chosen not to prepare a HVLA BPEO report at this stage because of the nature of the challenge, and further work is required.

Plutonium Contaminated Materials at Sellafield

The public consultation on what should be done with plutonium contaminated materials produced and stored as wastes at Sellafield ran from March until May 2007. Consultation documents, reports and final BPEO report can be seen through the links below.

PCM Brochure PCM Stakeholder Information
PCM Brochure PCM Stakeholder Information
   
PCM Workshop PCM Feedback

PCM Stakeholder Workshop Report

Assessment of Feedback from Stakeholder Questionnaire Responses

   
PCM Workshop  
PCM BPEO Study report  

LP&S content

A consultation on high level options for the remediation of Sellafield's Legacy Ponds and Silos was held between December 2005 and February 2006 and the report on the consultation and consultation document can be seen through the links below:

LPS Report Baseline Document
Report on Stakeholder Consultation Workshop on Sellafield Legacy Ponds and Silos, December 2005 Baseline document in support of Legacy Ponds and Silos consultation